MORAL CAST 160 AR GUN RFT is specially formulated to give high resistance to abrasion whilst being able to be placed using conventional gunnite methods.
The. comprehensive range of MORAL CAST dense castables covers the complete temperature spectrum up to 18150C. Four classes of product are offered; standard, abrasion resistant, gunning and extra-coarse aggregate. These products have been esigned utilising different aggregates and cement binders to ensure they meet the requirements of most applications.
Strict adherence to quality control measures has enabled each Thermal Ceramics Australia location to gain AS3902/IS09002 quality standard accreditation. All products are manufactured according to these tight standards, ensuring consistent high quality.
TYPICAL PHYSICAL PROPERTIES
(GUNNED TEST PANELS)
| Bulk Density (kg/M3) | Mean | Std.Dev |
| @ 110*C | 2135 | 25 |
| @ 1000*C | 2050 | 30 |
| @ 1600*C | 2130 | 23 |
| Cold Compressive Strength (MPa) | ||
| @ 110*C | 55 | 5 |
| @ 1000*C | 43 | 4 |
| @ 1600*C | 55 | 5 |
| Modulus of Rupture (NWa) | ||
| @ 1100C | 8 | 2 |
| @ iooooc | 8 | 2 |
| @ 16000C | 10 | 3 |
| Permanent Linear Change (%) | |
| 24 Hrs @ 110*C | 0.0 to -0.2 |
| 5 Hrs @ 1000*C | -0.1 to -0.3 |
| 5 Hrs @ 1600*C | -1.3 to -1.8 |
| Maximum Grain Size (mm) | 4 |
TYPICAL CHEMICAL ANALYSIS
| A1203 | 55% |
| SiO2 | 37% |
| Fe203 | 0.7% |
| CaO | 5.1% |
| TiO2 | 1.3% |
| mgo | Tr% |
| Alkalies | 0.2% |
Chemical analysis values are rounded off. Total may not be equal to 100%
APPLICATION DATA
Gunning
| Nett Quantity of dry material required for placement (kg/M3) | 2050 |
| Water Required for Pre-Wetting (% by weight) | Nil |
| Dwell Time (min) | Nil |
| Air Pressure at the Gun (kPa) | 230-270 |
| Rebound (% under ideal conditions on a vertical wall) | 5 |
MATERIAL PACKAGING
MORAL CAST 160 AR GUN RFT is packaged in multi-ply paper sacks, 25 kilograms per sack.
Nominal shelf life for MORAL CAST 160 AR GUN RFT is 6 months when correctly stored.
TYPICAL APPLICATIONS
INSTALLATION PROCEDURE
Refer to Installation Procedure IP/002
HEAT-UP SCHEDULE
Refer to Heat-up Schedule HS/001/A